Generator sets
Diesel
20–4,000 kVA · 50 / 60 Hz
Diesel generator sets
Standby, prime or continuous power.
Select the duty that matches your operating hours and load profile.
Start with the hours of operation, the fuel you can depend on and whether your site can use recovered heat.
Diesel and gas
Every set is built for one project.
| Decision | Diesel generator set | Gas generator set |
|---|---|---|
| Single-set rating | 20–4,000 kVA at 50 or 60 Hz. Size the alternator for the site’s power factor. | 100–2,000 kWe of electrical output, up to 2 MW per set. |
| Operating duty | Standby during outages, prime for variable loads or continuous for steady demand. | Base-load generation where the gas supply supports the planned running hours. |
| Step loads | Check the largest motor start or block of load against the set’s transient response. | Check the largest load step against the engine’s gas specification. Review whether loads need to start in stages. |
| Fuel supply | Plan tank capacity, deliveries and refuelling access for the required runtime. | Confirm gas composition, pressure and available flow for natural gas, biogas or associated gas. |
| Heat recovery | Choose the electrical duty first. Specify any heat-recovery requirement separately. | Power only, CHP for usable heat, or CCHP where a cooling load can use recovered heat. |
| Typical site fit | A standby plant or remote site with a dependable diesel delivery route. | A process plant with reliable gas and sustained electrical, heating or cooling demand. |
Operating duty
One of the first things we ask. The answer decides how hard the set works, and for how long.
Illustrative load over 24 hours
The grid carries the load. The set waits, starts when the grid fails, and holds the load until the grid returns.
There is no grid to rely on. The set is the supply, and follows the load as it rises and falls through the day.
The set runs at a steady load, hour after hour, for as long as the project needs it.
What makes a set
The loads, the duty and the site decide five things. Choose one to see what decides it.
01 · Enclosure
Developed and made in-house, for the site’s noise limits, climate, dust, moisture and salt.
02 · Controls
For a set working on its own, for sets in parallel, or for sets alongside the grid.
03 · Alternator
Choose 0.4–13.8 kV at the generator or switchgear terminals. For export at 33–110 kV, specify a step-up transformer.
04 · Engine
Chosen across 20+ major OEM platforms for the loads the set must carry, and for the duty it will run.
05 · Cooling
Sized for the ambient envelope and altitude of the place where the set will stand.
Generator sets
Diesel
20–4,000 kVA · 50 / 60 Hz
Diesel generator sets
Select the duty that matches your operating hours and load profile.
Cogeneration & base load
Gas
100–2,000 kWe · Up to 2 MW per set
Gas generator sets
Match the output to the site’s gas supply and the hours when it can use heat or chilled water.
Electricity
GeneratedPrimary bus
Heat
UnusedSteam / hot water
Cooling
OffChilled water
Power: base-load electricity generated from natural gas, biogas or wellhead gas.
CHP, combined heat and power: the same fuel delivers electricity plus steam or hot water.
CCHP, combined cooling, heat and power: electricity, process heat and chilled water together.
Diesel or gas, every set is tested in our factory before it ships.
How each set is testedWe require power for project, configured as sets.
Share preliminary load, duty and site parameters to begin technical scoping.