Diesel and gas generator sets · Built in our own factory since 2017

Discuss a project

Generator sets

Start with the hours of operation, the fuel you can depend on and whether your site can use recovered heat.

Finished white SILICO containerised generator set in three-quarter view inside the factory hall

Diesel and gas

Every set is built for one project.

Diesel vs. gas selection guide
DecisionDiesel generator setGas generator set
Single-set rating20–4,000 kVA at 50 or 60 Hz. Size the alternator for the site’s power factor.100–2,000 kWe of electrical output, up to 2 MW per set.
Operating dutyStandby during outages, prime for variable loads or continuous for steady demand.Base-load generation where the gas supply supports the planned running hours.
Step loadsCheck the largest motor start or block of load against the set’s transient response.Check the largest load step against the engine’s gas specification. Review whether loads need to start in stages.
Fuel supplyPlan tank capacity, deliveries and refuelling access for the required runtime.Confirm gas composition, pressure and available flow for natural gas, biogas or associated gas.
Heat recoveryChoose the electrical duty first. Specify any heat-recovery requirement separately.Power only, CHP for usable heat, or CCHP where a cooling load can use recovered heat.
Typical site fitA standby plant or remote site with a dependable diesel delivery route.A process plant with reliable gas and sustained electrical, heating or cooling demand.

Operating duty

How will it run?

One of the first things we ask. The answer decides how hard the set works, and for how long.

Illustrative load over 24 hours

The grid carries the load. The set waits, starts when the grid fails, and holds the load until the grid returns.

There is no grid to rely on. The set is the supply, and follows the load as it rises and falls through the day.

The set runs at a steady load, hour after hour, for as long as the project needs it.

What makes a set

Five choices.
Each made for the job.

The loads, the duty and the site decide five things. Choose one to see what decides it.

01 · Enclosure

Developed and made in-house, for the site’s noise limits, climate, dust, moisture and salt.

02 · Controls

For a set working on its own, for sets in parallel, or for sets alongside the grid.

03 · Alternator

Choose 0.4–13.8 kV at the generator or switchgear terminals. For export at 33–110 kV, specify a step-up transformer.

04 · Engine

Chosen across 20+ major OEM platforms for the loads the set must carry, and for the duty it will run.

05 · Cooling

Sized for the ambient envelope and altitude of the place where the set will stand.

Rows of white SILICO containerised gas generator sets connected to overhead CHP steam recovery pipework

Cogeneration & base load

Gas

100–2,000 kWe · Up to 2 MW per set

Gas generator sets

More than electricity, on suitable projects.

Match the output to the site’s gas supply and the hours when it can use heat or chilled water.

Electricity

GeneratedPrimary bus

Heat

UnusedSteam / hot water

Cooling

OffChilled water

Power: base-load electricity generated from natural gas, biogas or wellhead gas.

CHP, combined heat and power: the same fuel delivers electricity plus steam or hot water.

CCHP, combined cooling, heat and power: electricity, process heat and chilled water together.

Discuss a gas set

Compare packages for this duty

Diesel or gas, every set is tested in our factory before it ships.

How each set is tested

Project enquiry

We require power for project, configured as sets.

Discuss this project

Share preliminary load, duty and site parameters to begin technical scoping.